Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:W50S85-24-Q-A018
The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to repair East Ramp Light Pole Lowering System at Facility 8036. Holophane Prismbeam...
The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to repair East Ramp Light Pole Lowering System at Facility 8036. Holophane Prismbeam II Series Luminaire, at a height of 120 feet that is inoperable. Selfridge ramps have security lights that require monthly maintenance. Currently the East ramp security light pole number 6 mast lowering system is out of service. The lowering system is critical to performing monthly regular scheduled maintenance of the light. A lift capable of reaching at least 125 feet is required to perform the repair service to the light.