W50S84-21-B-0012 Repair Floors 6900
26 August 21: Bid Opening Report SF 1409 Posted 24 August 21: Additional RFIs answered. 20 August 21 Update Amendment 3 is posted. Amendment three updates the Wage Determination to the 20 August 21 ve...
26 August 21: Bid Opening Report SF 1409 Posted 24 August 21: Additional RFIs answered. 20 August 21 Update Amendment 3 is posted. Amendment three updates the Wage Determination to the 20 August 21 ve...
The contractor shall remove and dispose of existing flooring and cove base, and install new flooring, transition strips, matching cove base, and entry mats as detailed below. All work shall be perform...