V Rack Kits
The AFLCMC Digital Infrastructure Fielding Flight requires brand-name or equal infrastructure hardware to support enterprise-wide fielding of the Voltron+ (V+) capability at designated Priority 4, 5, and 6 Enterprise Sites. This includes 30 standardized Voltron+ rack kits (enclosures, metered PDUs, anchoring/grounding kits), 20 standalone 30A/200-208V rack PDUs, and 120 10-Gigabit SFP+ single-mode optical transceivers. Delivery is required within 45 days after receipt of order (ARO) with FOB Destination terms. Performance and delivery location is South Portland Air National Guard Station, 50 Western Ave, South Portland, ME 04106. The procurement is anticipated to be a Total Small Business Set-Aside competed as a Firm-Fixed-Price Purchase Order.