Inactive
Notice ID:W50S8020C0001
Current 1.6MW generator needs to be disconnected from the building and the CO2 scrubber. This 1.6MW generator and ATS will then be moved to the battery yard (located near the main gate) and will requi...
Current 1.6MW generator needs to be disconnected from the building and the CO2 scrubber. This 1.6MW generator and ATS will then be moved to the battery yard (located near the main gate) and will require a new concrete pad and conduit (to include grounding). Provide temporary generator on site, connect to building while change over takes place. New generator will be placed on the current pad and connected to the CO2 scrubber located on site. Modifications to the scrubber will be the responsibility of the contractor (if required). New generator will be connected to a new ATS (contractor provided as part of the project) any modification to the pad or conduit may be required. Connect to grounding/modify and install additional if required. Run electrical lines to the building, connect to the electrical panel. Test and commission with whole building testing over a 2 week period of on and off cycles. Provide test and commissioning reports, to include as built drawings of both generators and locations/connections.