B16 Generator PLC Upgrade
The Kansas National Guard seeks a single firm-fixed-price contract for upgrading a generator PLC at McConnell AFB in Wichita, Kansas. The work includes inspecting, troubleshooting, and repairing PLC controls, with an option to install a Hot Switch Bypass. The prime contractor must subcontract with 3E Company, the designated OEM regional representative. The contract duration is 60 calendar days after notice to proceed, and the project is 100% set aside for small businesses. The estimated construction cost is between $500,000 and $1,000,000, though funds are not currently available.
B16 Generator PLC Upgrade
The Kansas National Guard seeks a single firm fixed-price contract for upgrading a generator PLC at McConnell AFB in Wichita, Kansas. The base work involves inspecting, troubleshooting, and repairing generator PLC controls, with an option to install a Hot Switch Bypass. The prime contractor must subcontract with 3E Company, the designated OEM regional representative of Kohler. The contract duration is 60 calendar days after notice to proceed, and the project is 100% set aside for small businesses. The estimated construction magnitude is between $500,000 and $1,000,000, though funds are not currently available.
B16 Generator PLC Upgrade
The Kansas National Guard seeks a contractor to upgrade a generator PLC system at McConnell AFB in Wichita, Kansas. The work involves inspecting, troubleshooting, and repairing the controls, with an option to install a Hot Switch Bypass. The prime contractor must subcontract with the designated OEM representative, 3E Company. The project is set aside 100% for small businesses, with an estimated construction magnitude between $500,000 and $1,000,000. The contract duration will be 60 calendar days after notice to proceed.
B16 Generator PLC Upgrade
The Kansas National Guard seeks a contractor to upgrade the B16 Generator PLC at McConnell AFB in Wichita, Kansas. The firm fixed-price contract involves inspecting, troubleshooting, and repairing the PLC controls, with an option to install a Hot Switch Bypass. The prime contractor must subcontract with 3E Company, the designated OEM representative. The contract performance period is 60 calendar days after notice to proceed. The project is set aside for small businesses, with an estimated construction magnitude between $500,000 and $1,000,000, though funds are not currently available.