Total Small Business Set-Aside (FAR 19.5)
Notice ID:W50S7S20Q0011
Mod 1: Fixed Solicitation dates Mod 2: Added drawings, Site Visit MFR, and certifications. The work specified by this section consists of furnishing all labor, equipment, tools, appliances, transporta...
Mod 1: Fixed Solicitation dates Mod 2: Added drawings, Site Visit MFR, and certifications. The work specified by this section consists of furnishing all labor, equipment, tools, appliances, transportation, materials, and qualitycontrol reports required to perform modifications to Hangar Fire Suppression Systems. The work consists of three main items and multiple secondary items. The main items include programming/reconfiguring the foam releasing panel, replacing the manual foam releasing stations and conduits, and installing Surge Protection Devices (SPD) (also referred to as TVSS). The secondary items include providing de-humidifiers in the foam rooms and providing required signage.