AATTC Trailer Reconfiguration
This project involves three phases: interior upgrades to AATTC South trailers, exterior upgrades to the same trailers, and the decommissioning and removal of the North trailer group. The performance location is specified as the AATTC North and South trailers. A mandatory background check form must be submitted by 10 AM Local Time on January 23rd, 2026. The solicitation includes a revised contract line item description for proposal pricing. Site visits and pre-proposal conferences have been conducted, with related documentation provided.