149 MXS Pressure Washing System
This is a total small business set-aside for a firm-fixed price contract to supply a stationary pressure washing system for the 149th Fighter Wing at Lackland AFB, TX. The system must deliver water at or above 175°F, with two sprayers each requiring at least 3,000 PSI and 3.5 GPM simultaneously, and include 100-foot hose reels. A site visit is scheduled for June 10, 2026, with mandatory registration by May 27, 2026. The desired installation timeline is 60 days after receipt of order, and this factor is equal in importance to price during evaluation. Funds are not currently available for this contract, and the government’s obligation is contingent upon future appropriation.