Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:W50S7623Q0005
The 136th Airlift Wing requires the installation of a hydraulic test stand and all required infrastructure improvements to support it. The location, inside B1675, was originally designed to operate a ...
The 136th Airlift Wing requires the installation of a hydraulic test stand and all required infrastructure improvements to support it. The location, inside B1675, was originally designed to operate a hydraulic test stand, but the supporting systems are no longer sufficient for a newly received test stand. The hydraulic test stand has already been acquired and only needs installation. The goal with this project is to provide an autonomous system for the users of the test stand that requires no input aside from turning the machine on. The contractor shall furnish all labor, parts, tools, plant, equipment, appliances, transportation, and materials necessary to provide the installation of a hydraulic test stand and any required infrastructure to be fully functional. This includes modification of a chilled water system and electrical work. Additional information may be found in the attached project documents. This procurement is a 100% set-aside for Small Business concerns. In accordance with Federal Acquisition Regulation (FAR) 36.204: Project Magnitude is between $25,000 and $100,000. Site Visit Information: (a) Site Visit Date: 1 June 2023 (b) Site Visit Time: 10:30 AM (CST) (c) Instructions for Attendees: The Government will hold a site visit for the subject solicitation at the above listed time, at NAS JRB Fort Worth, Texas (Zip Code - 76127). In order to obtain installation access and the specific location for the site visit, interested parties must submit a request for attendance (not later than 48 hours prior to the scheduled site visit) to: 136.AW.MSC@us.af.mil and michael.meeks@us.af.mil The request for attendance must include the name (as it appears on government-issued identification) and company name of each attendee. Information provided at the site visit, as well as questions, shall not change/qualify the terms and conditions of the solicitation. Please be advised that entry to the installation requires processing through the Visitor’s Center. It is highly recommended that those who submit a request to attend allow an adequate amount of time for processing through the Visitor’s Center and installation gate. Project specifics may be found in the attached documents. UPDATES 8 JUNE 2023: Please see the posted amendment and the updated Statement of Work and its attachments.