Replace R22 HVAC System and Siemens Controls Upgrade
The contractor must replace the R22 HVAC system and upgrade Siemens Controls, including field panel controllers, across multiple buildings at Joint Base Andrews. All work must comply with JBA design guidelines, federal regulations, and manufacturer instructions. The response deadline has been extended to 17 July 2026, at 16:00 EDT. No budget amount is specified. Performance location is Joint Base Andrews.