Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:W50S6P20R00070002
The purpose of this amendment is to revise the SOW and the Summary and Instructions: **The changes to the SOW are highlighted and the summary follows: -Revised framing material requirement to allow us...
The purpose of this amendment is to revise the SOW and the Summary and Instructions: **The changes to the SOW are highlighted and the summary follows: -Revised framing material requirement to allow use of factory-painted, hot-dipped galvanized steel. -Revised the attachments to include dimensions of the concrete slabs where the pavilions will be sited. **The date of delivery has been revised to 90 days ADC and Q&A revised to 02 SEP 20. Mandatory provision and clauses 52.204-24, 52.204-25 and 52.204-26 have been added. **Attachment 52.204-24 must be returned with quote/offer** The requirement of this project is to provide and install two commercial grade steel pavilions. Pavilions shall meet the salient characteristics described in the attached SOW and shall be constructed entirely of maintenance free materials with a color scheme that matches the architecture of the adjacent facility.