Installation Backflow Preventers

Total Small Business Set-Aside (FAR 19.5)
Notice ID:W50S6M26QA012

This project requires the contractor to provide all labor, materials, and equipment to remove two existing backflow preventers and install two new ZURN 10” Model 375DA units at Building 700 in Birmingham, AL (35217). A mandatory site visit is scheduled for July 7, 2026, at 10 AM. The total performance period for the contract is 120 days. The contractor must comply with all installation access and security policies, including background checks and Antiterrorism Awareness Level I training. Payment will be made monthly through the government’s Wide Area Workflow system.