Replacement of Conference Room, and Command Suite Windows.
The project involves replacing/upgrading windows and screens in Bldg. 3127's third floor command suite and conference room. New windows must meet a minimum Sound Transmission Classification (STC) of 40, be triple-pane 1-3/4" glass with fiberglass frames, and retain the same opening/closing operation as existing units. Color selections require approval, existing blinds will be removed and reinstalled, paint will be matched, and exterior windows will receive reflective film to match the building's south side. The period of performance is 15 weeks.