Notice ID:W508SW-26-R-A001
The work covered by this specification consists of furnishing all labor, equipment, material and performing all work to: remove existing roof membrane and install Sprayed Polyurethane Foam (SPF) roofs...
The work covered by this specification consists of furnishing all labor, equipment, material and performing all work to: remove existing roof membrane and install Sprayed Polyurethane Foam (SPF) roofs for building 37 on the base. The parapet caps and metal flashing shall be replaced to match existing.