Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:W15QKN-24-R-5074
The Contractor shall provide all plant, labor, equipment, tools, materials, supervision, and transportation to accomplish the following work which consist of but is not limited to exterior brick, lint...
The Contractor shall provide all plant, labor, equipment, tools, materials, supervision, and transportation to accomplish the following work which consist of but is not limited to exterior brick, lintel repointing and repair. All quantities are estimated. Contractor shall field verify all dimensions and quantities prior to ordering material. Failure of the contractor to conduct a site visit and appreciate the complexity of the specifications herein shall not indemnify said contractor from contract obligations as stated. All work completed herein shall be in accordance with but not limited to: • UNIFIED FACILITIES GUIDE SPECIFICATIONS (UFGS) – HTTPS://WWW.WBDG.ORG/FFC/DOD/UNIFIED-FACILITIES-GUIDE-SPECIFICATIONS-UFGS • UFC – UNIFIED FACILITIES CRITERIA • ARMY REGULATION 420-1 • RCRA – RESOURCE CONSERVATION AND RECOVERY ACT • EM 385-1-1, SAFETY and HEALTH REQUIREMENTS MANUAL • OSHA Standards – General Industry 29 CFR 1910