Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:W15QKN-24-R-5073
The Contractor shall provide all plant, labor, equipment, tools, materials, supervision, and transportation to accomplish the following work which consist of but is not limited to the removal of varia...
The Contractor shall provide all plant, labor, equipment, tools, materials, supervision, and transportation to accomplish the following work which consist of but is not limited to the removal of variable refrigerant flow systems (VRF), the installation of mini split ductless systems and all required hardware and accessories, and the installation and programming of HVAC controls systems. All quantities are estimated. Contractor shall field verify all dimensions and quantities prior to ordering material. Failure of the contractor to conduct a site visit and appreciate the complexity of the specifications herein shall not indemnify said contractor from contract obligations as stated. All work completed herein shall be in accordance with but not limited to: • UNIFIED FACILITIES GUIDE SPECIFICATIONS (UFGS) – HTTPS://WWW.WBDG.ORG/FFC/DOD/UNIFIED-FACILITIES-GUIDE-SPECIFICATIONS-UFGS • UFC – UNIFIED FACILITIES CRITERIA • ARMY REGULATION 420-1 • RCRA – RESOURCE CONSERVATION AND RECOVERY ACT • EM 385-1-1, SAFETY and HEALTH REQUIREMENTS MANUAL