Inactive
Notice ID:W15QKN-19-R-0040
The purpose of this amendment is to extend the proposal due date to 4 February 2019 also changes made to statement of work and required Alumium. All other asspects of this solicitation remain unchange...
The purpose of this amendment is to extend the proposal due date to 4 February 2019 also changes made to statement of work and required Alumium. All other asspects of this solicitation remain unchanged. Updated SOW: DESCRIPTION/SPECIFICATIONS/WORK STATEMENT Statement of Work (SOW) for Towing & Tie Down Aluminum 1. Background: The Armament Research, Development and Engineering Center (ARDEC) of the U.S. Army located at Picatinny Arsenal, NJ, develops processes for manufacturing and producing hardware for weapon systems and platforms. In order to continue the mission ARDEC requires raw material from commercial vendors to supply its input inventory. To maintain compliance to demanding program schedules and production deliveries, qualified vendors of metal and metal alloy materials must be readily available for material acquisition. Scope: To provide specialized supplies of metal and metal alloy materials in support of U.S. Army, ARDEC. 2. Applicable Documents AR 710-3 Asset Tracking Reporting System MIL-STD-1916 DoD Preferred Methods for Acceptance of Product 3. Requirements: 3.1 The contractor shall produce and deliver: • Twenty (QTY: 20): BAR, RECTANGLE, 3" x 3.5" X 6', MATERIAL: ALUMINUM, 5083-H111, SPEC ASTM B221, OPTIONAL MATERIAL: ALUMINUM B2215083-H32, SPEC ASTM B209, OR ALUMINUM, 5059-H111, SPEC ASTM B209, OR ALUMINUM, 5083-H116 SPEC ASTM B928, OR ALUMINUM, 5083-H321, SPEC ASTM B928M, OR ALUMINUM, 5083-H111, SPEC ASTM B221, OR ALUMINUM, 5086-H111, SPEC ASTM B221B92 • Three (QTY: 3): PLATE, 3" x 60" x 65", MATERIAL: ARMOR, ALUMINUM, 5083, SPEC MIL-DTL-46027 • One (QTY:1): PLATE, 1" x 48" x 72", MATERIAL: ARMOR, ALUMINUM, 5083, SPEC MIL-DTL-46027 • One (QTY: 1): PLATE, 2.12" x 48" x 96", MATERIAL: ARMOR, ALUMINUM, 5083, SPEC MIL-DTL-46027 • Seventeen (QTY: 17): PLATE, 3" x 60" x 65", MATERIAL: ARMOR, ALUMINUM, 5083, SPEC MIL-DTL-46027 4. General Requirements 4.1 The contractor shall provide Certificate of Compliance and Material Certificates from the Mill DI-MISC-81356A, Certificate of Compliance (A001) , 4.2 The contractor shall immediately report any major accident or incident (including fire) resulting in one or more of the following: causing one or more fatalities; or one or more disabling injuries; damage to Government property exceeding $10,000; affecting program planning or production schedules; degrading the safety of equipment under contract such that personal injury or property damage may be involved; identifying a potential hazard requiring corrective action. The contractor shall prepare an Accident/Incident Report for each incident in accordance with DI-SAFT-81563, Accident/ Incident Report (A002). 5. Classification: The classification of this effort is UNCLASSIFIED 6. Period of Performance: The period of performance under the resultant order shall be from 20 weeks following the effective date. Per the following delivery schedule. 7. Delivery Schedule: The contactor shall deliver all requirements in full within two (2) weeks after contract award. • Twenty (QTY: 20) ALUMINUM, BAR, RECTANGLE, 5083-H111, 3" x 3.5" x 6', Per ASTM B221 o Acceptable Alternates ? 5083-H32, PER ASTM B209 ? 5059-H111, PER ASTM B209 ? 5083-H116, PER ASTM B928 ? 5083-H116, PER ASTM B928M ? 5083-H111, PER ASTM B221 ? 5086-H111, PER ASTM B221/B92 • One (QTY: 1) ARMOR, ALUMINUM, PLATE, 5083, 1" x 48" x 72", Per MIL-DTL-46027 • Three (QTY: 3) ARMOR, ALUMINUM, 5083, 3" x 60" x 65", Per MIL-DTL-46027 • One (QTY: 1) ARMOR, ALUMINUM, PLATE, 5083, 2.12" x 48" x 96", Per MIL-DTL-46027 The contactor shall deliver all requirements in full within twenty (20) weeks after contract award. • Seventeen (QTY: 17) ARMOR, ALUMINUM, 5083, 3" x 60" x 65", Per MIL-DTL-46027 NOTE: Faster, earlier, and larger deliveries are acceptable and preferred for all items 8. Shipping Provisions: Deliverables shall be sent to the following POCs: All deliverables under this proposal will be shipped FOB Destination to the POC at the following address: TRANSPORTATION OFFICER, W52H1C BLDG 299, BECK AND GILESPIE EAST END, RECG DOOR 16A ROCK ISLAND IL 61299-5000