F100CoreModuleContainer_End_Item_F100_NSN_8145014524579NZ_PN_P4078843
This requirement is competitive but limited to sources already approved by the U.S. Air Force. The part requires engineering source approval by the Design Control Activity to maintain quality. Acquisition must be from approved sources due to their unique design capability, engineering skills, and manufacturing knowledge. An alternate source would need to qualify in accordance with Design Control Activity procedures as approved by the engineering activity.