TRAILING EDGE, AIRCRAFT
This opportunity is for the procurement of TRAILING EDGE, AIRCRAFT spares for the B-1B, now unrestricted after a set-aside withdrawal. The required delivery for the main line item (32 units, with a range of 8-48) is on or before 20 JAN 2027, with first article and compliance items due by 20 JUL 2026. Performance location is specified as destination SW3211 for the main items, with other items shipped to FY2303 and FA8111. No budget amount is specified. Award requires approval by the design control activity (The Boeing Company), and the government does not own the data rights needed for manufacture.