20--CONTROL CIRCUIT,ENG
The Government requires 84 units of the specified part, with delivery FOB origin. The part requires engineering source approval by the design control activity to maintain quality. Existing qualified sources have unique design capability, engineering skills, and manufacturing/repair knowledge, and they retain data rights or technical data that are not economically available to the Government and are essential to part quality. An alternate source must qualify under the design control activity’s procedures, as approved by the cognizant Government engineering activity, and those qualification procedures must be approved by the Government engineering activity with jurisdiction over the part’s intended application.