28--BLADE,COMPRESSOR,AI
The requirement is for 27 EA of a part (reference 5140T15G02) delivered FOB origin. The part requires engineering source approval by the design control activity to maintain quality, due to unique design capability, engineering skills, and manufacturing/repair knowledge held by approved sources. Approved sources retain data rights and technical data that are not economically available to the Government but are essential for quality. An alternate source must qualify according to the design control activity’s procedures, as approved by the cognizant Government engineering activity. Qualification procedures must also be approved by the Government engineering activity with jurisdiction over the part’s intended application.