49--BORESIGHTING EQUIPM
The requirement is for 18 EA of a part, with delivery FOB origin. Engineering source approval by the design control activity is required to maintain part quality. Acquisition/repair must come from approved source(s) because they hold unique design capability, engineering skills, manufacturing/repair knowledge, and data rights not economically available to the Government. Alternate sources must qualify under design control activity procedures approved by the cognizant Government engineering activity, and those qualification procedures must be approved by the Government engineering activity with jurisdiction over the part’s intended application.