66--INDICATOR,DIGITAL D
The contractor must maintain a quality control system compliant with MIL-I-45208A, MIL-Q-9858, ISO 9000/9001/9002, or equivalent, and must develop and maintain a Repair Quality Plan plus QC, test, repair, and inspection procedures for Government review and approval. The work includes purchased-material control, receiving inspection, failure analysis/corrective action reporting, nonconforming-material control, and recordkeeping, with inspection records retained at least 12 months after end-item acceptance. The contractor is delegated IRB authority only for minor nonconformances, scrap, or rework; “AS-IS” and other minor nonconformance dispositions remain with the Government via DCMC to the NAVSUP Contracting Officer. The Government may randomly select repaired CLINs quarterly for repair assessment testing and ship them to CFA or another Government-designated location. Markings must comply with MIL-STD-130, packaging with MIL-STD-2073 as specified in the schedule, and no drawings are available.