30--CYLINDER ASSEMBLY,A
This is a critical ALRE shipboard aircraft launch/recovery item requiring manufacture, testing, and inspection to NAWC Lakehurst drawing 514762-8 Rev AJ (CAGE 80020) under ISO 9001 or higher, with source approval required and only approved companies eligible for award. Drawings are not available; contractors must provide all tooling and manufacturing aids and perform required critical processes (heat treat, welding, cadmium/chrome plating, forging per MPR 1221) with 100% critical-characteristic inspection, NDT, first-article, and production-lot testing. Manufacturing and First Article/production must occur at the same contractor facility, with source inspection by DCMAO/QAR and production lot samples shipped to Naval Air Warfare Center Aircraft Division; records must be retained for 7 years and raw material documentation for 10 years. Non-bid timing includes at least 14 days’ notice before final inspection and First Article testing, First Article test report within 15 calendar days, Government First Article action within 45 days, and production-lot testing allowing 165 days with lab results notification within 120 days. First Article and production-lot testing waivers may be available for previously approved identical items, and award is limited to sources approved by Naval Air Systems Command.
Links (1)
Attachments (34)
Data sourced from SAM.gov.
View Official Posting »