VALVE,LINEAR,DIRECT
This is a 100% Total Small Business Set-Aside (NAICS 332919, 750-employee size standard) for FMS new spares, designated as a Critical Safety Item for ALRE, requiring engineering source approval from Naval Air Systems Command; no drawings are available. Only companies with approved source status—or those able to submit a detailed Source Approval Request—are eligible for award, and pre-award surveys/post-award conferences may be required for new manufacturers. First Article Testing by the Government is required, with an estimated test cost of $5,000; samples are evaluated within 45 working days of receipt, the contractor must notify the Government 14 calendar days before testing, and test reports are due within 15 calendar days. Performance includes inspections at the contractor’s location (interim, in-process, and final) with required advance notifications of 7-10 days, while final inspection and certification occur at NAWC Lakehurst, NJ. A 12-month warranty applies after last delivery, and all manufacturing/inspection records must be maintained for seven years.
Links (3)
Attachments (16)
Data sourced from SAM.gov.
View Official Posting »