48--ACTUATOR,ELECTRO-ME
This procurement requires repair-related quality assurance for items, with marking per MIL-STD-130, and no drawings are available for the RFP. The contractor must maintain a quality control system meeting MIL-I-45208A, MIL-Q-9858, ISO 9000/9001/9002 or equivalent, and prepare inspection, test, and repair procedures plus a Repair Quality Plan for Government review/approval. The contractor is responsible for purchased material control, receiving inspection against the Technical Data Package, failure analysis and corrective action reporting, nonconforming material control, and an internal review board limited to minor nonconformances or rework/scrap, while Government retains MRB authority for “as-is” dispositions. The Government may conduct repair assessment testing on randomly selected CLIN samples from quarterly repair production, and the contractor must maintain historical records, including receipt inspection, repair travelers, parts replacement/inspection, and acceptance test data, for at least 12 months after end-item acceptance. Packaging applies per MIL-STD-2073 as specified in the schedule, with Wide Area Workflow payment instructions included.