81--SHIPPING AND STORAG
This opportunity involves manufacturing specialized containers using rotational molding with polyethylene, requiring strict adherence to a specific design drawing and quality standards. The contract includes a First Article Test (FAT) requirement, with one sample unit due 120 calendar days after contract award, and the government estimates testing costs at $12,000. Performance location is not specified, but the contracting activity is DLA Weapons Support in Philadelphia. The contractor must bear all costs for FAT sample shipment and testing, and welding must meet AWS standards with specific material and process controls. New manufacturers may require a pre-award survey and post-award conference due to the item's critical use and quality history.