81--NRP,SHIPPING AND ST
This opportunity is for the manufacture of plastic, rotomolded containers requiring Engineering Source Approval from the design activity. New manufacturers must undergo a pre-award survey and post-award conference, and all offerors must comply with detailed technical drawings and specifications. The contract includes a First Article Test (FAT) requirement, with one sample due 120 calendar days after contract award, and the government estimates the cost of this testing at $10,000. Production units must pass 100% leak tests and an 18-inch free fall drop test. The place of performance is not specified in the description.