81--SHIPPING AND STORAG
This opportunity is for the manufacture of a specialized container, requiring engineering source approval from the design activity for new manufacturers. The contractor is responsible for all tooling and manufacturing aids, and must comply with strict welding, material, and quality standards, including a prohibition on MIL-W-81381 wire. A pre-award survey and post-award conference may be required for new manufacturers, and a First Article Test (FAT) is required, with the first article due 60 calendar days from contract award and government testing estimated to cost $12,000. The location for FAT delivery is the Naval PHS&T Center at Naval Weapons Station Earle in Colts Neck, NJ. Production units must pass a 100% drop test and leak test, and all containers require a Unique Identification (UID) marking.