81--SHIPPING AND STORAG
This opportunity is for the manufacture of specialized aluminum containers requiring engineering source approval, with performance intended for a government defense contract. The contractor must deliver one First Article Test (FAT) unit within 120 calendar days to a designated test facility, with the government estimating the testing cost at $10,000. All costs for shipping the FAT unit to and from the test facility are the contractor's responsibility. The work involves strict welding, cleaning, and quality assurance requirements, including a 100% production leak test and a free-fall drop test. The location for performance is not specified, but the design activity is DLA Aviation Philadelphia, and the test facilities are in Lakehurst, NJ, and Picatinny Arsenal, NJ.