81--SHIPPING AND STORAG
This opportunity involves manufacturing specialized aluminum containers for the U.S. Navy, requiring engineering source approval and a pre-award survey for new manufacturers. The contractor must produce containers in accordance with specific drawings and detailed technical requirements, including welding, sealing, and unique identification marking. A First Article Test (FAT) is required, with one sample due 120 calendar days after contract award, and the government estimates testing costs at $10,000. The location for performance of services is not specified, but the FAT sample must be shipped to a location determined by the buyer. Prospective bidders should note the stringent quality and testing requirements, including a 100% production leak test involving an 18-inch drop.