81--SHIPPING AND STORAG
This opportunity is for the manufacture of a shock-qualified container for shipboard and DoD transportation use, requiring engineering source approval and strict adherence to a specific design drawing. The contractor is responsible for all tooling and manufacturing aids, and must comply with detailed welding, material, and sealing specifications, including a prohibition on MIL-W-81381 wire. A First Article Test (FAT) is required, with one unit due 120 calendar days after contract award, and the government estimates testing costs at $12,000, plus an additional $60,000 if shock test recertification is needed. The location for performance is not specified, but the FAT will be conducted at facilities in Lakehurst, NJ, and Picatinny Arsenal, NJ. New manufacturers may be subject to a pre-award survey and post-award conference.