81--SHIPPING AND STORAG
This opportunity is for the manufacture of specialized containers requiring engineering source approval, with a 100% small business set-aside. The contractor must manufacture, test, and inspect the items per specific drawings, with all tooling and manufacturing aids being the contractor's sole responsibility. A First Article Test (FAT) is required, with one unit due 120 calendar days from contract award, and the government estimates the testing cost at $10,000. The contractor bears all costs for shipping the FAT sample to and from the test facility, which is located at Naval Air Warfare Center in Lakehurst, NJ, or Picatinny Arsenal, NJ. Performance of services is not explicitly tied to a single location, but production must occur at the same facility as the FAT sample.