81--SHIPPING AND STORAG
This opportunity is for the manufacture of a specialized aluminum container requiring engineering source approval, with a total small business set-aside. The contractor must manufacture, test, and inspect the item per specific drawings and must provide all necessary tooling and manufacturing aids. A pre-award survey and post-award conference may be required for new manufacturers, and a First Article Test (FAT) is required, with one unit due 120 calendar days from contract award. The government estimates the cost of its FAT testing effort at $12,000, and the test sample must be shipped to a designated facility in Lakehurst, NJ or Picatinny Arsenal, NJ. The contract includes strict welding, cleaning, and quality assurance requirements, with 100% production drop testing required.