POWER SUPPLY
The Navy has a high-priority CASREP requirement for a POWER SUPPLY, with absolute best delivery required due to breakdown of mission-essential equipment. Award will be made using Lowest Price Technically Acceptable criteria. Offerors must propose the specified CAGE/reference-number design, identify the OEM/CAGE and part number if not the manufacturer, and meet authorized-distributor and traceability requirements; refurbished material is not acceptable. Changes in design, material, servicing, or part number require written Contracting Officer approval. Quality assurance requires contractor inspection, records retained for 365 calendar days after final delivery, MIL-STD-130 marking, MIL-STD-2073 packaging, and source inspection/acceptance.