POWER SUPPLY SUBASS
This opportunity is for the manufacture and supply of a POWER SUPPLY SUBASSEMBLY, with inspection and acceptance required at the source. The contract will be awarded based on the Lowest Price Technically Acceptable (LPTA) criteria, and the contractor must comply with cybersecurity maturity model certification requirements. Performance of work is restricted to the named facility unless a change is approved by the Contracting Officer, with a $250 price reduction required for any such change. The item must meet specific design and marking requirements, including MIL-STD-130, and only authorized distributors of the original manufacturer will be considered for award. All inspection records must be kept available for 365 calendar days after final delivery.