CONTROL ASSEMBLY,AC
This is a solicitation for the manufacture of a CONTROL ASSEMBLY, AC, issued in accordance with commercial acquisition procedures. The evaluation for award will be based on Lowest Price Technically Acceptable (LPTA) criteria. A key requirement is that offerors must be authorized distributors of the original manufacturer's item and provide proof of such authorization with their quote. The contractor is responsible for inspection, and any change to the approved production facility requires a written request and must include a $250 price reduction to cover administrative costs. Invoices and receiving reports must be submitted electronically through the PIEE-WAWF system.