POWER SUPPLY ASSEMB
This is a contract for the manufacture of a POWER SUPPLY ASSEMBLY, requiring strict adherence to design specifications from a specified Cage Code and compliance with standards like MIL-STD-130. The contractor is responsible for quality assurance and inspection, with records to be maintained for 365 days after final delivery. Key requirements include using authorized distributors, submitting invoices electronically via PIEE-WAWF, and obtaining government approval for any changes to the production facility. The performance location is not specified, and no budget or non-bid timelines are provided.