CONTROL,ANTENNA
This amendment extends the quotation due date to April 1, 2026. The requirement is for the manufacture of a CONTROL, ANTENNA, with specific design and quality requirements tied to a manufacturer's Cage Code. Inspection of the material and final acceptance will occur at locations to be specified by the contractor. The performance of work is prohibited at any location other than that named in the contract without specific written approval from the Contracting Officer.