DETECTOR, CHIP
This is a contract for the manufacture of a DETECTOR, CHIP, with inspection and acceptance requirements specified. The delivery timeline is listed as "Delivery days_________aro," and the offer validity period is listed as "Offer valid for _____ days," but no specific calendar dates are provided. The performance location for production facility changes is restricted to the place named in the contract unless a written change is approved by the Contracting Officer. Key requirements include using a specific Cage Code/Reference Number, compliance with MIL-STD-130 for marking, and a mandatory process for any design or part number changes. Contractors must be authorized distributors of the original manufacturer's item and provide proof with their offer.