CIRCUIT CARD ASSEMB
This is a contract for the manufacture of a CIRCUIT CARD ASSEMBLY, requiring strict adherence to specified design, quality assurance, and packaging standards. The performance location is not specified, but any change to the production facility requires written approval from the Contracting Officer and must include a $250 price reduction to cover administrative costs. Inspection of the material and its packaging will occur at locations to be specified by CAGE code and address. The contractor is responsible for all inspection requirements and must maintain related records for 365 days after final delivery. Only authorized distributors of the original manufacturer's item will be considered for award, and they must provide proof of authorization with their offer.