SWITCHING UNIT,POWE
This is a contract for the manufacture of a "Switching Unit, Power" with specific design and quality requirements tied to a listed Cage Code and reference number. The performance location is not specified, but any change to the production facility named in the final contract requires advance written approval from the Contracting Officer and must include a $250 price reduction to cover administrative costs. Inspection of the material and final acceptance will occur at locations to be specified by Cage Code and address. The contractor is responsible for all inspection requirements and must maintain those records for 365 days after final delivery. Offerors must be authorized distributors of the original manufacturer's item and provide proof of authorization with their quote.