INDICATOR,ELECTRICA
SPRMM126QMC32
This is a contract for the manufacture of an electrical indicator, with specific requirements tied to a designated manufacturer's cage code and part number. The performance location is not specified, but any change to the production facility requires written approval from the Contracting Officer and must include a $250 administrative cost reduction. Inspection and acceptance responsibilities primarily fall to the contractor, with the government reserving audit rights. Vendors must be authorized distributors of the original manufacturer and provide proof with their offer.