METER,POWER FACTOR
This is a contract for the manufacture of a Power Factor Meter, requiring the item to be produced according to a specific design referenced by a CAGE code. The performance location is not specified, but any change to the production facility requires written approval from the Contracting Officer and must include a price reduction of $250.00 to cover administrative costs. Inspection of the material and final acceptance will occur at locations to be determined, as the CAGE codes and addresses for these inspections are left blank in the solicitation. The contractor is responsible for all inspection requirements and must maintain related records for 365 days after final delivery. Quotes must specify any exceptions to the solicitation, and distributors must provide proof of authorization from the original manufacturer.