WINDOW,MARINE
This is a contract for the manufacture of a marine window, with specific design and quality requirements tied to a Cage Code and reference number. The performance location is not specified, but any change to the production facility requires written approval from the Contracting Officer and must include a price reduction of $250.00 to cover administrative costs. Inspection of the material and final acceptance locations are to be determined and filled in by the contractor. The contractor is responsible for all inspection requirements and must maintain related records for 365 days after final delivery. Vendors are encouraged to register for electronic systems to receive notifications and manage orders.