ACTUATOR,STEERING,M
This is a government procurement for the manufacture of a steering actuator, with specific requirements tied to the original manufacturer's design and Cage Code. The performance location is not specified, but any change to the production facility requires written approval from the Contracting Officer and must include a $250 administrative cost reduction. The budget is not specified. The timeline for delivery is listed as "Delivery days_________aro," indicating it is to be determined or filled in. Key requirements include inspection at source, strict controls on design changes, and proof of authorized distributor status for bidders.