MONITOR
SPRMM126QMC11
This is a contract for the manufacture of a MONITOR, with specific design and quality requirements tied to a Cage Code and reference number. The contractor is responsible for inspection and quality assurance, with records to be maintained for 365 days after final delivery. The performance location is not specified, but any change to the production facility requires written approval from the Contracting Officer and must include a $250 price reduction to cover administrative costs. No budget or specific delivery timeline is provided.