CONTROL,REVERSE ACT
This is a total small business set-aside for the manufacture and supply of a CONTROL, REVERSE ACT item, with inspection and acceptance required at the source. The desired delivery is 90 days after contract award, and all freight is FOB origin. The contract requires compliance with military standards for packaging, marking, and configuration control, and traceability is required. Quotes must be submitted to the contracts office by postal mail or email, and distributors must include an authorized distributor letter from the manufacturer. No specific budget amount or performance location is stated in the description.