PUMP UNIT,ROTARY
This opportunity is for the manufacture and supply of a PUMP UNIT, ROTARY, with delivery required 90 days after contract award (ADC) and all freight on an FOB Origin basis. Inspection and acceptance of the supplies must occur at the source, not at the destination. The contract requires compliance with military standards for packaging and marking, including MIL-STD-2073 and MIL-STD-130, and traceability documentation is necessary. Quoters must verify the nomenclature, part number, and NSN before responding, and distributors must provide a letter from the manufacturer confirming authorized distributor status. No specific budget amount or performance location is mentioned in the description.