TOOL,CVT DITMCO
This is a solicitation for the manufacture of a specific tool (TOOL, CVT DITMCO) according to precise design specifications from a designated Cage Code. The performance location is not specified, and any change to the production facility requires written approval from the Contracting Officer and must include a $250 price reduction to cover administrative costs. Inspection of the material and final acceptance will occur at locations to be specified by the contractor. Award will be determined using a trade-off process where price is more important than past performance. Vendors must provide proof of being an authorized distributor of the original manufacturer's item to be considered for award.